The exact delivery time different items different dispatch time, normally it as:
--For the marine engines and generator sets:
less than 500hp, delivery time within 30-35 days.
Power 500-1000hp delivery time within 55-60 days.
Power more than 1000hp delivery time within 3-6 months.
--For the propeller and stern shaft with tubes:
The delivery time normally within 40-45 days.
--For the steering systems:
Manpower hydraulic steering system normally about 10-15 days for the delivery time.
Electrical hydraulic steering system normally need at least one month about.
--For the marine windows, doors, valves, pumps, hatchcover, oily water separator, sewage treatment plant, sea water desalination, manhole, bollards, bow chock, top caps, air fans and other hardware parts.
--For the deck machine such as cranes, winches and anchor windlass, anchor and steel wires and ropes:
The delivery time will be normally 2 months about, but some size for the steel wires and ropes we have large stock.
--For the marine lights, chairs, gauges, navigation communication parts and some quick wear parts:
We nearly all have in stock, delivery time within 7-10 days.
If you want We Sinooutput combine all the complete marine parts for your ships, please give us enough time, normally at least 2 months, because we at least need 3 days for further matched test, and if you want with the marine class certificate, the delivery time will be a little longer than above mentioned. thank you.